Framing Parte Dos: Revenge of the House!

So with the  “Side shed” framed up, I finally got around to the front of the house. the house is originally 850 sqft., so I was on the hunt for any extra square footage i could find. I talked to the county, and they okeyed me bumping out the front of the house to what was the front porch. this this bought me an extra 100 square feet. and let me fit the front office/bedroom into the house: so far so good.

The first thing that needed to happen to build onto the front was remove the porch roof, and siding. I rented a roll-off to put the old lumber in. After i finish with the front, I will start framing up my walls, so i went ahead and stripped all the old siding off the house to get access to the studs.

Nekid!

So the guys who built the foundations for the porch must have had an off day. The builders had the front porch angled off from the rest of the house, I made for some creative framing, but in the end I think I was able to get it lined up.

The county wanted me to add additional studs in the walls, so I took the opportunity to frame up my windows where i wanted them.  then sheathed the whole thing in OSB.


 

After the front was done I moved around and did the same on the back.


So now all the foundation, floors and walls are all in good shape and up to code, the only thing left is the roof.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s